With the problem of increasing sedimentation in Deep Bay, WWF decided in 2004 that a new boardwalk and floating birdwatching hide was necessary further out on the Deep Bay mudflats to allow students and other visitors to view the spectacle of migratory waterbirds using this internationally important wetland over a greater range of tidal heights.

Earlier this year WWF obtained a number of Government licenses and permissions for the works including an Environmental Permit from the Environmental Protection Department. Works commenced in July 2007 and will be completed by 31 October.

The project involves the building of a 600 meter fixed boardwalk as an extension to the existing floating boardwalk that lies outside the Closed Area Fence at Mai Po, and will run through the inter-tidal mangroves to a new floating hide that will have a capacity for some 30 people (See Figure 1 below).

An anonymous donor provided the bulk of the money for the project whilst contributions also came from Cheung Kong (Holdings) Ltd., and WWF's annual Big Bird Race fundraising event.

We apologise for any inconvenience this may cause over the coming months. For more information, please contact either Lew Young or Bena Smith (Tel 2471-6306).

(Previous postings on the BBS Click Here)

世界自然基金會全新的木橋和觀鳥屋

由於后海灣的沉積問題愈發嚴重,本會於2004年決定需在后海灣泥灘較出位置建造一條全新的木橋和觀鳥屋,讓學生和其他參觀人士能於這塊國際重要濕地內,觀察遷徙水鳥在更多不同潮水高度時的生態。
今年年初,本會現已取得政府發出的各項許可證,包括由環境保護署發出的環境許可證。工程已於2007年7月動工,將於10月31日或以前完成。
工程包括興建一條長600米的固定木橋,接駁現時位於米埔邊境禁區內的浮橋,並穿過潮間帶的紅樹林,通往可容納30人的全新觀鳥屋。(見圖1)
本工程的大部分支出由一名不願透露姓名的贊助人支付,而其餘的資金則來自長江實業(集團)有限公司的捐款和本會每年舉辦的香港觀鳥大賽所籌得的款項。
以上工程進行期間,若為閣下構成任何不便,本會謹此致歉。如欲查詢進一步資料,請聯絡楊路年或施百納,電話:2471-6306。

(連結至舊貼 Click Here)

Figure 1. Location of boardwalks and birdwatching hides.

TOP

Boardwalk Project Update : 23rd August 2007

As of 23rd August, boardwalk construction has reached post no.9 along the proposed boardwalk route (see Figure below). At this rate (avg. 88m/week) they should reach the final 550m mark by early September and Shenzhen by mid October!



TOP

Today the new boardwalk finally reached the end of the mangrove trees (Photo 1) i.e. Marker 11 (see last posting). All that remains is a short boardwalk section out to where the new hide will be and a screen down eitherside to prevent disturbance to any birds before entering the hide.

Staff visited the shipyard this morning to see progress on the new floating hide. So far it is only the floating base which has been constructed (Photo 2), but fingers crossed it will be ready for launching down the slipway on 7th October.

Photo 1. Field staff reaching the end of the mangrove (Marker 11)



Photo 2. Base of the new floating hide

TOP

The hide is now finished and ready to be moved to Deep Bay from Shau Kei Wan (near Quarry Bay). The hide will be launched from the shipyard at 01:00 (1 a.m.) on the morning of Monday 8th October and take around 12 hours to tow.

If you are near the south-west or west coast of Hong Kong on Monday you may well see the hide en route to Deep Bay - across Victoria Harbour, under the Tsing Yi bridge, along the coast near Tuen Mun and around into Tsim Bei Tsui.

Photo : The hide nearly complete - 03 October 2007

TOP

Dear Andrew,

WWF experienced a few problems in October with the project, so the opening date is now changed.

As you know the boardwalk is fully constructed and all that remains is the bird hide to be put in place. In the morning of Friday 2nd November, the Government Flying Services will move the concrete anchors into position on the mudflat. Then, during the evening of 10th November the Marine Police will move the hide from Tsim Bei Tsui pier across to the mangrove edge location. After that there are a few minor interior changes to be done by WWF.

Realistically we are looking at the end of November, but a further notice will be posted on this BBS once the date has been confirmed.

Sorry for the delay; it’s been a long arduous process, but we will get there!

Bena Smith
WWF Reserve Officer

TOP

As many of you know the birdwatching hide was successfully transferred across Deep Bay on the evening of Saturday 10th November by the HK Marine Police. It is now securely anchored in place at the end of the new boardwalk (See photo below). Over the last 2 weeks we had to do some basic internal work to make it safe and ready for use by the public.

After notifying the EIA dept. we can now announce that the hide will be opened for use from Monday 26th November. There remains a few very minor works to sort, so a more formal opening will take place in mid-December. From personal observations over the last couple of weeks it would seem a 1.7m tide height brings waterbirds to within a suitable viewing distance of the new hide (“Just like the old days!” I am told).

Thank you to all those people/organisations that kindly supported the project. This includes; the HKBWS, Green Power, KFBG and Conservancy Association for their letters of support; free assistance given by the HK Towage and Salvage Company Ltd, HK Government Flying Services and HK Marine Police to transfer the hide and concrete anchors; and of course the anonymous donor and BBR fundraisers.

Please remember that if you use the WWF hides you should carry your WWF Hong Kong membership card. Checks will be carried out periodically by our staff.

TOP

WWF has placed about 30 small bamboo markers in front of the new floating hide and old hide. These are needed to carry out waterbird surveys on the mudflat to meet a special condition of the Environmental Permit for the hide project. The markers are colour coded and set to about 20cm from the mud floor. They will be in place until the end of April.

Please do not mistake them for illegal marker posts. Thank you.

Bena Smith
WWF Reserve Officer
3193 7511

TOP

Thread